Singapore: A.P. Moller – Maersk (Maersk) has officially opened a 1.1 million square feet, fully automated global and regional distribution centre in Singapore, the World Gateway II, marking a major expansion of its contract logistics and e-commerce capabilities in Asia Pacific.
Supported by the Singapore Government, the facility is designed to serve the rapidly growing demand of companies that rely on Singapore as a regional or global distribution centre due to its prime location and its status as a top logistics hub. It also caters to B2B and B2C e-commerce fulfilment across Asia Pacific. It will handle a wide range of products from verticals including lifestyle, Fast Moving Consumer Goods (FMCG), retail, wellness and technology.
Leveraging Singapore’s strategic location and connectivity, the site enables efficient distribution of cargo overseas, with close proximity to major transport infrastructure, including the Tuas Port and Changi Airport. It is also located a short distance from Maersk’s World Gateway regional distribution centre, which measures 1.0 million square feet.
Vincent Clerc, CEO of Maersk said ” The launch of World Gateway II reflects the importance of Singapore to our global network and the immense opportunities we see in Asia. Underpinned by continued export strength and increasing consumption, Asia’s growth trajectory remains extraordinary. This new facility is yet another milestone of our fast-growing integrated logistics business in the region, and how we support customers with more resilience and flexibility.”
Advanced automation to drive efficiency and scale
The warehouse is equipped with cutting-edge automation technologies, including a Multi-Shuttle System, Automated Storage and Retrieval System (ASRS) and Autonomous Case-handling Robots (ACR).. These systems enable faster order fulfilment, shorter lead times, and improved accuracy by reducing manual handling.
Maersk has invested more than S$200 million for the development of World Gateway II, which has reached approximately 70 per cent occupancy. Once fully operational, the site will create around 500 jobs utilising advanced digital and automation capabilities.
World Gateway II – Facility Highlights
11-metre clear height per floor – supports dense storage and advanced automation
Ample loading bays and rooftop container parking – ready for peak season demand
Prime location – 16.8 kilometres from Tuas Mega Port, 42.6 kilometres from Changi Airport
Customs bonded, zero-GST warehouse storage – import Goods and Service Tax (GST) deferred on non-dutiable goods until goods enter the market
End-to-end transport management system – real-time shipment tracking and full visibility of flow of goods
Value-added services – such as labelling, coding, bundling, kitting, re-packing
Integrated Warehouse Management System (WMS) – offers integration with customers’ systems, boosting accuracy, visibility, and agility
LEED Platinum & Green Mark Platinum certified – reduced energy and water use with solar panels, smart LED lighting, energy-efficient insulation
Top-tier security standards– Transported Asset Protection Association (TAPA) Class A certified for secure warehousing